The Administrative Record INDEX of all documents in the Administrative Record can be accessed from the link below:
Information Repository Index Alabama Army National Guard Organizational Maintenance Shop 28 (OMS-28) December 2023 |
||||||||
File Name | Included in AR | Phase | Document Type | Document Title/Description | Author | Recipient(s) | Date | Approx. # of Pages |
OMS28_0001_AR | Y | Underground Storage Tank Investigation | Work Plans-Site Safety and Health Plans-Progress Reports | Secondary Investigation Addendum Work Plan OMS #28 – Pit 2 | Bechtel-S Corp | USACE | 2004-09-01 | 97 |
OMS28_0002_AR | Y | Underground Storage Tank Investigation | Correspondence | Review of Draft Secondary Investigation Addendum Report | Pierce, John W. (ADEM, Hydrogeologist) | Sartwell, Wayne A. (Lieutenant Colonel MS, ALARNG) | 2005-07-19 | 1 |
OMS28_0003_AR | Y | Underground Storage Tank Investigation | Correspondence | Review of ARBCA Tier 1/Tier 2 Reports | Pierce, John W. (ADEM, Hydrogeologist) | Sartwell, Wayne A. (Lieutenant Colonel MS, ALARNG) | 2005-07-19 | 2 |
OMS28_0004_AR | Y | Underground Storage Tank Investigation | Report | Secondary Investigation Addendum Report OMS #28 – Pit 2 | Bechtel-S Corp | USACE | 2005-08-01 | 176 |
OMS28_0005_AR | Y | Underground Storage Tank Investigation | Report | ARBCA for USTs Tier 1 Report | ADEM | unknown | 2005-09-01 | 96 |
OMS28_0006_AR | Y | Underground Storage Tank Investigation | Correspondence | Submittal Revised ARBCA Tier 1/Tier 2 Reports | Woodall, William L. (USACE, HTRW) | Pierce, John W. (ADEM, Hydrogeologist) | 2005-09-07 | 1 |
OMS28_0007_AR | Y | Underground Storage Tank Investigation | Correspondence | Submittal Final Secondary Investigation Addendum Report | Woodall, William L. (USACE, HTRW) | Pierce, John W. (ADEM, Hydrogeologist) | 2005-09-07 | 1 |
OMS28_0008_AR | Y | Underground Storage Tank Investigation | Report | Semi-Annual Groundwater Monitoring Report | Aerostar Environmental Services, Inc. | USACE | 2005-11-01 | 49 |
OMS28_0009_AR | Y | Remedial Investigation | Work Plans-Site Safety and Health Plans-Progress Reports | Work Plan TCE Investigation | Aerostar Environmental Services, Inc. | USACE | 2006-02-01 | 70 |
OMS28_0010_AR | Y | Remedial Investigation | Work Plans-Site Safety and Health Plans-Progress Reports | Health and Safety Plan | Aerostar Environmental Services, Inc. | USACE | 2006-02-01 | 19 |
OMS28_0011_AR | Y | Underground Storage Tank Investigation | Correspondence | Letter RE: Review of Semi-Annual Groundwater Monitoring Report Dated November 2005 | Pierce, John W. (ADEM, Hydrogeologist) | Sartwell, Wayne A. (Lieutenant Colonel MS, ALARNG) | 2006-03-03 | 1 |
OMS28_0012_AR | Y | Underground Storage Tank Investigation | Report | Natural Attenuation Monitoring Report | Aerostar Environmental Services, Inc. | 2006-06-01 | 21 | |
OMS28_0013_AR | Y | Remedial Investigation | Sampling and Analysis Data | Lab Results | Gulf Coast Analytical Laboratories | Aerostar Environmental Services, Inc. | 2006-10-27 | 51 |
OMS28_0014_AR | Y | Underground Storage Tank Investigation | Report | Semi-Annual Groundwater Monitoring Report | Aerostar Environmental Services, Inc. | USACE | 2006-11-01 | 21 |
OMS28_0015_AR | Y | Underground Storage Tank Investigation | Correspondence | Review of Semi-Annual Groundwater Monitoring Report Dated November 2006 and No Further Action With Conditions | Pierce, John W. (ADEM, Hydrogeologist) | Sartwell, Wayne A. (Lieutenant Colonel MS, ALARNG) | 2007-03-26 | 4 |
OMS28_0016_AR | Y | Remedial Investigation | Sampling and Analysis Data | Lab Results | Gulf Coast Analytical Laboratories | Aerostar Environmental Services, Inc. | 2007-03-29 | 32 |
OMS28_0017_AR | Y | Remedial Investigation | RI Report and other Final RI-Related Reports | TCE COMPREHENSIVE INVESTIGATION | Aerostar Environmental Services, Inc. | USACE | 2007-04-01 | 404 |
OMS28_0018_AR | Y | Remedial Investigation | Correspondence | Letter RE: Alabama National Guard Site – TCE Comprehensive Investigation at OMS 28 | Keller, Kathleen D. (ADEM, Hydrogeologist) | Turk, William (ARNG) | 2007-06-28 | 2 |
OMS28_0019_AR | Y | Well Abandonment | Correspondence | Letter RE: Alabama National Guard Site – Response to ADEM and TCE Comprehensive Investigation at OMS 28, Abandon Wells | Keller, Kathleen D. (ADEM, Hydrogeologist) | Turk, William (ARNG) | 2007-08-17 | 1 |
OMS28_0020_AR | Y | Remedial Investigation | Work Plans-Site Safety and Health Plans-Progress Reports | Supplemental Comprehensive Investigation Work Plan | Aerostar Environmental Services, Inc. | USACE | 2008-03-01 | 44 |
OMS28_0021_AR | Y | Remedial Investigation | Work Plans-Site Safety and Health Plans-Progress Reports | Supplemental Comprehensive Investigation Work Plan Appendix A: Sampling and Analysis Plan | Aerostar Environmental Services, Inc. | USACE | 2008-03-01 | 8 |
OMS28_0022_AR | Y | Remedial Investigation | Work Plans-Site Safety and Health Plans-Progress Reports | Supplemental Comprehensive Investigation Work Plan Appendix B: Site Safety Health Plan | Aerostar Environmental Services, Inc. | USACE | 2008-03-01 | 64 |
OMS28_0023_AR | Y | Remedial Investigation | Work Plans-Site Safety and Health Plans-Progress Reports | Supplemental Comprehensive Investigation Work Plan Appendix C: Investigation Derived Waste Management Plan | Aerostar Environmental Services, Inc. | USACE | 2008-03-01 | 8 |
OMS28_0024_AR | Y | Remedial Investigation | Correspondence | SUBJECT: Supplemental Comprehensive Investigation, Groundwater Incident No. GW 07-01-02, OMS-28 | Woodall, William L. (USACE, HTRW) | Reeves, Chad (ADEM) | 2008-03-18 | 1 |
OMS28_0025_AR | Y | Remedial Investigation | Correspondence | Letter RE: Alabama National Guard Site – Supplemental Comprehensive Investigation Work Plan | Reeves, Chad (ADEM, Hydrogeologist) | Turk, William (ARNG) | 2008-04-16 | 1 |
OMS28_0026_AR | Y | Remedial Investigation | Correspondence | Letter RE: Response to April 16, 2008 Supplemental Comprehensive Investigation Work Plan | Sartwell, Wayne A. (Lieutenant Colonel MS, ALARNG) | Reeves, Chad (ADEM) | 2008-05-01 | 1 |
OMS28_0027_AR | Y | Well Abandonment | Report | Monitoring Well Abandonment for Alabama National Guard | Eschete, Marshall (Aerostar Environmental Services, Inc) | unknown | 2008-05-19 | 4 |
OMS28_0028_AR | Y | Well Abandonment | Correspondence | SUBJECT: Well Abandonment Report, Supplemental Comprehensive Investigation, Groundwater Incident No. GW 07-01-02, OMS-28 | Shirley, Melissa L. (USACE-Mobile District) | Reeves, Chad (ADEM) | 2008-05-27 | 2 |
OMS28_0029_AR | Y | Remedial Investigation | Work Plans-Site Safety and Health Plans-Progress Reports | Investigation Derived Waste Manifest | unknown | unknown | 2008-06-13 | 1 |
OMS28_0030_AR | Y | Well Abandonment | Correspondence | Letter RE: Well Abandonment Report | Reeves, Chad (ADEM, Hydrogeologist) | Turk, William (ARNG) | 2008-07-10 | 1 |
OMS28_0031_AR | Y | Remedial Investigation | Correspondence | Letter RE: Acceptable Response to Comments | Reeves, Chad (ADEM, Hydrogeologist) | Turk, William (ARNG) | 2008-07-10 | 1 |
OMS28_0032_AR | Y | Remedial Investigation | RI Report and other Final RI-Related Reports | Supplemental Comprehensive Investigation Report, Soil and Groundwater Investigation 2008 | Aerostar Environmental Services, Inc. | ALARNG | 2008-11-01 | 262 |
OMS28_0033_AR | Y | Remedial Investigation | Correspondence | Submittal of Supplemental Comprehensive Investigation, Groundwater Incident No. GW 07-01-02, OMS-28 | Woodall, William L. (USACE, HTRW) | Reeves, Chad (ADEM) | 2008-11-12 | 1 |
OMS28_0034_AR | Y | Remedial Investigation | Sampling and Analysis Data | 1st Groundwater Monitoring Lab Results | Gulf Coast Analytical Laboratories | Aerostar Environmental Services, Inc. | 2008-12-19 | 48 |
OMS28_0035_AR | Y | Remedial Investigation | Correspondence | Certification: Alabama Registered Professional Geologist | Eschete, Marshall (Aerostar Environmental Services, Inc) | unknown | 2009-04-01 | 1 |
OMS28_0036_AR | Y | Remedial Investigation | RI Report and other Final RI-Related Reports | Supplemental Comprehensive Investigation Groundwater Monitoring Report | Aerostar Environmental Services, Inc. | USACE | 2009-04-01 | 120 |
OMS28_0037_AR | Y | Remedial Investigation | Correspondence | SUBJECT: Supplemental Comprehensive Investigation, Groundwater Incident No. GW 07-01-02, OMS-28 | Woodall, William L. (USACE, HTRW) | Reeves, Chad (ADEM) | 2009-04-23 | 1 |
OMS28_0038_AR | Y | Remedial Investigation | Correspondence | Letter RE: Alabama National Guard Site – Supplemental Comprehensive Investigation Report and Supplemental Comprehensive Investigation Groundwater Monitoring Report | Reeves, Chad (ADEM, Hydrogeologist) | Turk, William (ARNG) | 2009-07-15 | 1 |
OMS28_0039_AR | Y | Remedial Investigation | RI Report and other Final RI-Related Reports | 2nd Groundwater Monitoring Report with Lab Results | Aerostar Environmental Services, Inc. | USACE | 2009-08-01 | 115 |
OMS28_0040_AR | Y | Remedial Investigation | Correspondence | SUBJECT: 2nd Supplemental Comprehensive Investigation Groundwater Monitoring Report | Shirley, Melissa L. (USACE-Mobile District) | Reeves, Chad (ADEM) | 2009-08-14 | 1 |
OMS28_0041_AR | Y | Remedial Investigation | Correspondence | Letter RE: Alabama National Guard Site – Supplemental Comprehensive Investigation Groundwater Monitoring Report | Reeves, Chad (ADEM, Hydrogeologist) | Turk, William (ARNG) | 2009-10-08 | 1 |
OMS28_0042_AR | Y | Remedial Investigation | RI Report and other Final RI-Related Reports | 3rd Groundwater Monitoring Report with Lab Results | Aerostar Environmental Services, Inc. | USACE | 2009-12-01 | 117 |
OMS28_0043_AR | Y | Remedial Investigation | Correspondence | SUBJECT: 3rd Supplemental Comprehensive Investigation Groundwater Monitoring Report | Shirley, Melissa L. (USACE-Mobile District) | Reeves, Chad (ADEM) | 2009-12-11 | 1 |
OMS28_0044_AR | Y | Remedial Investigation | Correspondence | Letter RE: 3rd Supplemental Comprehensive Investigation Groundwater Monitoring Report | Blake, Alan B. (ADEM- Groundwater Branch) | Shirley, Melissa L. (USACE-Mobile District) | 2010-01-28 | 1 |
OMS28_0045_AR | Y | Remedial Investigation | RI Report and other Final RI-Related Reports | 4th Groundwater Monitoring Report with Lab Results | Aerostar Environmental Services, Inc. | USACE | 2010-06-01 | 114 |
OMS28_0046_AR | Y | Remedial Investigation | Correspondence | SUBJECT: 4th Supplemental Comprehensive Investigation Groundwater Monitoring Report | Shirley, Melissa L. (USACE-Mobile District) | Mitchell, Colin (ADEM) and Chad Reeves (ADEM) | 2010-06-22 | 1 |
OMS28_0047_AR | Y | Remedial Investigation | Correspondence | Letter RE: 4th Supplemental Comprehensive Investigation Groundwater Monitoring Report | Cobb, Stephen A. (ADEM- Governmental Hazardous Waste Branch) | Woodall, William USACE | 2010-08-06 | 2 |
OMS28_0048_AR | Y | Remedial Investigation | Correspondence | Letter RE: Response to 4th Supplemental Comprehensive Investigation Groundwater Monitoring Report | Elliott, Glenn (ARNG-ILE-C) | Mitchell, Colin (ADEM) and Chad Reeves (ADEM) | 2010-09-14 | 2 |
OMS28_0049_AR | Y | Remedial Investigation | Correspondence | Letter RE: 5th Supplemental Comprehensive Investigation Groundwater Monitoring Report | Elliott, Glenn (ARNG-ILE-C) | Mitchell, Colin (ADEM) and Chad Reeves (ADEM) | 2010-12-28 | 1 |
OMS28_0050_AR | Y | Remedial Investigation | RI Report and other Final RI-Related Reports | 5th Groundwater Monitoring Report with Lab Results | Aerostar Environmental Services, Inc. | USACE | 2011-01-01 | 116 |
OMS28_0051_AR | Y | Remedial Investigation | RI Report and other Final RI-Related Reports | Alabama Risk-Based Corrective Action Report | Aerostar Environmental Services, Inc. | USACE | 2011-03-01 | 441 |
OMS28_0052_AR | Y | Remedial Investigation | Correspondence | SUBJECT: Alabama Risk Based Corrective Action Report | Munger, Michaelle M. (Lieutenant Colonel, USACE-Mobile District) | Mitchell, Colin (ADEM) and Chad Reeves (ADEM) | 2011-03-16 | 1 |
OMS28_0053_AR | Y | Remedial Investigation | Correspondence | Letter RE: ADEM Review and Concurrence – Installation Action Plan | Cobb, Stephen A. (ADEM- Governmental Hazardous Waste Branch) | Riggins, Rachel (ALARNG) | 2011-03-18 | 1 |
OMS28_0054_AR | Y | Remedial Investigation | RI Report and other Final RI-Related Reports | Alabama Risk Based Corrective Action (ARBCA) Computational Software Evaluation 1 | Risk Assessment and Management (RAM) Group, Inc. | USACE | 2011-03-18 | 77 |
OMS28_0055_AR | Y | Remedial Investigation | RI Report and other Final RI-Related Reports | Alabama Risk Based Corrective Action (ARBCA) Computational Software Evaluation 2 | Risk Assessment and Management (RAM) Group, Inc. | USACE | 2011-03-18 | 77 |
OMS28_0056_AR | Y | Remedial Investigation | Correspondence | Letter RE: ADEM Review and Comments -5th Supplemental Comprehensive Investigation Groundwater Monitoring Report | Cobb, Stephen A. (ADEM- Governmental Hazardous Waste Branch) | Munger, Michaelle LTC (ARNG-ILE-C) | 2011-03-31 | 2 |
OMS28_0057_AR | Y | Remedial Investigation | Correspondence | SUBJECT: 5th Supplemental Comprehensive Investigation Groundwater Monitoring Report | Munger, Michaelle M. (Lieutenant Colonel, USACE-Mobile District) | Mitchell, Colin (ADEM) | 2011-04-11 | 2 |
OMS28_0058_AR | Y | Remedial Investigation | Correspondence | Letter SUBJECT: Remedial Investigation Report | Munger, Michaelle M. (Lieutenant Colonel, USACE-Mobile District) | Mitchell, Colin (ADEM) | 2011-06-14 | 1 |
OMS28_0059_AR | Y | Remedial Investigation | Correspondence | Letter RE: ADEM Response – Remedial Investigation (RI) Report | Cobb, Stephen A. (ADEM- Governmental Hazardous Waste Branch) | Munger, Michaelle LTC (ARNG-ILE-C) | 2011-08-10 | 1 |
OMS28_0060_AR | Y | Remedial Investigation | RI Report and other Final RI-Related Reports | Remedial Investigation Report Revision 1 | Science Applications International Corporation | USACE | 2012-12-01 | 108 |
OMS28_0061_AR | Y | Remedial Investigation | Correspondence | Letter: RI Rev 1 | Bryant, Anthony B. (Major, ARNG) | Mitchell, Colin (ADEM) | 2012-12-11 | 1 |
OMS28_0062_AR | Y | Remedial Investigation | Correspondence | Letter RE: ADEM Response – Remedial Investigation (RI) Report Revision 1 | Cobb, Stephen A. (ADEM- Governmental Hazardous Waste Branch) | Bryant, Anthony B. (Major, ARNG) | 2013-03-22 | 2 |
OMS28_0063_AR | Y | Remedial Investigation | RI Report and other Final RI-Related Reports | Remedial Investigation Report Revision 2 | Science Applications International Corporation | USACE | 2013-05-01 | 106 |
OMS28_0064_AR | Y | Remedial Investigation | Correspondence | Submittal of Remedial Investigation (RI) Report Revision 1 Response to Comments | Bryant, Anthony B. (Major, ARNG) | Mitchell, Colin (ADEM) | 2013-05-28 | 1 |
OMS28_0065_AR | Y | Remedial Investigation | Correspondence | Letter RE: ADEM Concurrence – RI Report Revision 2 | Cobb, Stephen A. (ADEM- Governmental Hazardous Waste Branch) | Bryant, Anthony B. (Major, ARNG) | 2013-08-08 | 1 |
OMS28_0066_AR | Y | Feasibility Study | Report | Feasibility Study Report | Leidos Consulting Engineers, Inc. | USACE | 2014-02-01 | 112 |
OMS28_0067_AR | Y | Feasibility Study | Correspondence | Letter RE: Submittal of Feasibility Study | Williams, Brandye L. (Major ARNG) | Mitchell, Colin (ADEM) | 2014-02-07 | 1 |
OMS28_0068_AR | Y | Feasibility Study | Correspondence | Letter RE: ADEM Response: Feasibility Study (FS) for the Alabama Army National Guard (ALARNG) | Cobb, Stephen A. (ADEM- Governmental Hazardous Waste Branch) | Williams, Brandye L. (Major ARNG) | 2014-05-05 | 2 |
OMS28_0069_AR | Y | Public Affairs/Community Relations | Public Notification / Correspondence | Notification of Alabama Army National Guard (ALARNG) Mobile Organizational Maintenance Shop-28 (OMS-28) Administrative Record File Establishment | Cook, Robert J. (ALARNG) | Stimpson, Sandy Mayor of City of Mobile | 2015-05-26 | 2 |
OMS28_0070_AR | Y | Public Affairs/Community Relations | Public Notification / Correspondence | Notification of Alabama Army National Guard (ALARNG) Mobile Organizational Maintenance Shop-28 (OMS-28) Administrative Record File Establishment | Cook, Robert J. (ALARNG) | Carl, Jerry Commissioner of District 3 Mobile County Commission | 2015-05-26 | 2 |
OMS28_0071_AR | Y | Public Affairs/Community Relations | Public Notification / Correspondence | Notification of Alabama Army National Guard (ALARNG) Mobile Organizational Maintenance Shop-28 (OMS-28) Administrative Record File Establishment | Cook, Robert J. (ALARNG) | Davis Figures, Vivian Senator of District 33/Mobile County | 2015-05-26 | 2 |
OMS28_0072_AR | Y | Public Affairs/Community Relations | Public Notification / Correspondence | Notification of Alabama Army National Guard (ALARNG) Mobile Organizational Maintenance Shop-28 (OMS-28) Administrative Record File Establishment | Cook, Robert J. (ALARNG) | Small, C.J. Councilman Of Council District 3 of the City of Mobile | 2015-05-26 | 2 |
OMS28_0073_AR | Y | Public Affairs/Community Relations | Public Notification / Correspondence | Notification of Alabama Army National Guard (ALARNG) Mobile Organizational Maintenance Shop-28 (OMS-28) Administrative Record File Establishment | Cook, Robert J. (ALARNG) | Clarke, Adline Representative House District 97/ Mobile County | 2015-05-26 | 2 |
OMS28_0074_AR | Y | Historical Research | Report | Historical Research Study Report – OMS #28 | Berger, Louis | USACE | 2015-08-01 | 459 |
OMS28_0075_AR | Y | Public Affairs/Community Relations | Public Notification / Correspondence | Public Announcement Posting in Press Register on June 17,2015 | ALARNG | General Public | 2015-08-26 | 1 |
OMS28_0076_AR | Y | Public Affairs/Community Relations | Public Notification / Correspondence | Public Announcement Posting in Press Register on June 19,2015 | ALARNG | General Public | 2015-08-26 | 1 |
OMS28_0077_AR | Y | Public Affairs/Community Relations | Public Notification / Correspondence | Public Announcement Posting in Press Register on June 21,2015 | ALARNG | General Public | 2015-08-26 | 1 |
OMS28_0078_AR | Y | Remedial Investigation | Work Plans-Site Safety and Health Plans-Progress Reports | Uniform Federal Policy – Quality Assurance Project Plan | AECOM Technical Services, INC. | USACE | 2016-01-01 | 489 |
OMS28_0079_AR | Y | Remedial Investigation | Correspondence | ADEM Response UFPQAPP | Cobb, Stephen A. (ADEM- Governmental Hazardous Waste Branch) | Merkel, Brett (ARNG) | 2016-06-02 | 11 |
OMS28_0080_AR | Y | Public Affairs/Community Relations | Public Notification / Correspondence | OMS 28 RAB Public Interest Survey March 2018 | ALARNG | General Public | 2018-03-11 | 2 |
OMS28_0081_AR | Y | Public Affairs/Community Relations | Community Involvement Plan | Final Mobile OMS 28 29 Community Involvement Plan | Dawson Technical, LLC | US Army Environmental Command and USACE | 2018-06-01 | 45 |
OMS28_0082_AR | Y | Remedial Investigation | RI Report and other Final RI-Related Reports | Data Gap Investigation Report and GW Monitoring Report | AECOM Technical Services, Inc. | USACE | 2019-01-01 | 3485 |
OMS28_0083_AR | Y | Remedial Investigation | Correspondence | Submittal Data Gap Investigation and GW Monitoring Report | Connolly, David (ARNG) | Mitchell, Colin (ADEM) | 2019-01-09 | 1 |
OMS28_0084_AR | Y | Remedial Investigation | RI Report and other Final RI-Related Reports | Risk Assessment Report | AECOM Technical Services, Inc. | USACE | 2019-03-01 | 534 |
OMS28_0085_AR | Y | Remedial Investigation | Correspondence | Submittal Risk Assessment | Connolly, David (ARNG) | Mitchell, Colin (ADEM) | 2019-03-15 | 1 |
OMS28_0086_AR | Y | Remedial Investigation | Correspondence | ADEM Review and Concurrence – Supplemental Data Gap Report | Wilson, Jason (ADEM) | Connolly, David (ARNG) | 2020-01-21 | 1 |
OMS28_0087_AR | Y | Remedial Investigation | Correspondence | OMS 28 Future FS, PP, and DD for Site and PCE ineligible | Mungin-Davis, Queenie (ARNG) | Mitchell, Colin (ADEM) | 2020-09-10 | 3 |
OMS28_0088_AR | Y | Remedial Investigation | Correspondence | ADEM Review and Response – Responsibility for PCE Contamination | Wilson, Jason (ADEM) | Mungin-Davis, Queenie (ARNG) | 2021-02-25 | 1 |
OMS28_0089_AR | Y | Remedial Investigation | Correspondence | ADEM Review and Comment – Risk Assessment Report | Wilson, Jason (ADEM) | Mungin-Davis, Queenie (ARNG) | 2021-02-25 | 4 |
OMS28_0090_AR | Y | Public Affairs/Community Relations | Public Notification / Correspondence | OMS 28 RAB Public Interest Survey October 2021_Press Register | ALARNG | General Public | 2021-10-10 | 1 |
OMS28_0091_AR | Y | Public Affairs/Community Relations | Public Notification / Correspondence | OMS 28 RAB Public Interest Survey October 2021_Lagniappe Weekly | ALARNG | General Public | 2021-10-13 | 3 |
OMS28_0092_AR | Y | Remedial Investigation | Correspondence | ARNG Response to ADEM Review Comments dated February 15, 2021 | Mungin-Davis, Queenie (ARNG) | Mitchell, Colin (ADEM) | 2021-11-10 | 4 |
OMS28_0093_AR | Y | Remedial Investigation | Correspondence | ADEM Review and Evaluations: Responses to Comments dated November 10, 2021 | Wilson, Jason (ADEM) | Mungin-Davis, Queenie (ARNG) | 2022-01-20 | 3 |
OMS28_0094_AR | Y | Remedial Investigation | Report | Risk Assessment Report, Revision 1 | AECOM Technical Services, Inc. | USACE and ARNG | 2022-05-01 | 532 |
OMS28_0095_AR | Y | Remedial Investigation | Correspondence | Submittal of Risk Assessment Report, Revision 1 | Mungin-Davis, Queenie (ARNG) | Mitchell, Colin (ADEM) | 2022-05-19 | 1 |
OMS28_0096_AR | Y | Remedial Investigation | Correspondence | Transmittal of Risk Assessment Report, Revision 1 with Response to Comments Crosswalk | AECOM Technical Services, Inc. | USACE, ARNG and ADEM | 2022-05-19 | 12 |
OMS28_0097_AR | Y | Site Management | Correspondence | Transmittal of Information Repository and Administrative Record DVD Binder | AECOM Technical Services, Inc. | USACE, ARNG and ADEM | 2022-08-22 | 2 |
OMS28_0098_AR | Y | Remedial Investigation | Correspondence | ADEM Review and Comment: Risk Assessment Report for Organizational Maintenance Shop 28 (OMS 28), Revision 1, dated May 19, 2022 | Mungin-Davis, Queenie (ARNG) | Wilson, Jason (ADEM) | 2022-10-12 | 3 |
OMS28_0099_AR | Y | Remedial Investigation | Report | Risk Assessment Report, (Revision 2) | AECOM Technical Services, Inc. | USACE and ARNG | 2023-03-01 | 548 |
OMS28_0100_AR | Y | Remedial Investigation | Correspondence | Submittal of Risk Assessment Report, Revision 2 with Response to Comments | Mungin-Davis, Queenie (ARNG) | Mitchell, Colin (ADEM) | 2023-03-09 | 6 |
OMS28_0101_AR | Y | Site Management | Correspondence | Transmittal of Information Repository and Administrative Record DVD Binder | AECOM Technical Services, Inc. | USACE, ARNG and ADEM | 2023-03-29 | 2 |
OMS28_0102_AR | Y | Site Management | Correspondence | ADEM Acknowledgment of Receipt: Information Repository and Administrative Record | Mastin, Ashley (ADEM) | Mungin-Davis, Queenie (ARNG) | 2023-04-18 | 1 |
OMS28_0103_AR | Y | Remedial Investigation | Correspondence | ADEM Review and Concurrence: Risk Assessment Report Revision 2 | Mastin, Ashley (ADEM) | Mungin-Davis, Queenie (ARNG) | 2023-05-25 | 1 |
OMS28_0104_AR | Y | Feasibility Study | Report | Feasibility Study | AECOM Technical Services, Inc. | USACE and ARNG | 2023-10-01 | 336 |
OMS28_0105_AR | Y | Public Affairs/Community Relations | Public Notification / Correspondence | Public Notice of Community Interest Survey for Restoration Advisory Board published in the Call News | ALARNG | General Public | 2023-10-04 | 1 |
OMS28_0106_AR | Y | Public Affairs/Community Relations | Public Notification / Correspondence | Public Notice of Community Interest Survey for Restoration Advisory Board published in the Lagniappe Weekly | ALARNG | General Public | 2023-10-04 | 1 |
OMS28_0107_AR | Y | Feasibility Study | Correspondence | Submittal of Feasibility Study dated October 2023 | Mungin-Davis, Queenie (ARNG) | Mitchell, Colin (ADEM) | 2023-10-30 | 1 |